Water Supply (A.E.P), Sanitation, and Various Networks:
Long-distance water supply pipelines in Djamaa, El Oued.
Construction of sanitation, water supply, and fire-fighting networks in the industrial zone in Oued El-Berdy, Bouira province, on 200 hectares.
Construction of the wastewater treatment plant in El-Kerma, Oran.
Construction of the wastewater treatment plant in El Bayadh.
The El-Kerma plant covers an area of 26 hectares with a daily treatment capacity of 270,000 m³ serving 1,500,000 inhabitants.
The El Bayadh plant covers an area of 16 hectares in the north of Oued El-Bayadh, with seven treatment basins and a capacity of 7.19 million m³/year, treating over 19,670 m³ daily. Initially, the treated water will irrigate about 200 hectares of agricultural land.
Well Drilling Works
Drilling a potable water well in the city of Adrar at a depth of 830 meters.
Drilling a water well in the municipality of Mih Ounssa at a depth of 341 meters in El Oued province.
Drilling a water well in the municipality of Hassani Abdelkrim at a depth of 210 meters in El Oued